Plant Diagnosis
Optimization begins with operating data rather than equipment sales. SENC reviews the actual mass balance, pressure profile, temperature approach, utility consumption and equipment operating points to identify the dominant constraint.
Typical Work Areas
Process
- Converter performance
- Heat-exchanger approach
- Absorption balance
- Gas-side pressure drop
Utilities & equipment
- Pump-system efficiency
- Cooling-water load
- Steam balance
- Equipment replacement / revamp
Execution Method
- Baseline operating model
- Data reconciliation and performance gap
- Option screening
- Technical and economic comparison
- Defined pilot or implementation scope
Operating Support
Support can be limited to a targeted engineering study or extended through troubleshooting, revamp definition, commissioning and post-start-up performance review.
Engineering starts with the actual operating basis.
Share feed composition, capacity, utility conditions and project objectives. SENC will define the appropriate study scope.